通用banner
Your current location : Home >> News >> UP Information

ContactContact Us

Zhongshan UP Sanitary Ware Co.

Address: UP Building, Building 9, No. 5, Xinggang South Road, Gangkang Town, Zhongshan City

Investment Hotline: 400-803-1398

Landline: 0760-28108999

Mobile: 13702380889

Email: zsupwy@163.com

How to install shower room?

2022-04-14 16:02:45
a

Shower room brand manufacturers show you how to install shower rooms


1. Install the overall shower room, separate the corresponding space from the bathroom, determine the installation location of the overall shower room, where the waterways will be distributed during decoration, how to drill holes, etc.


2. First assemble the bottom basin in a fixed position. If there is water in the bottom basin during the test, it will usually be tilted during installation. You need to check whether the water in the bottom basin is level before installation.


3. Conduct a waterproof test on the installed bottom basin.



The shower room installation method is as follows:


1. The shower room frame is made of aluminum alloy, and the surface is sprayed with plastic, which will not rust. The independent shower room of the shower room must have flexible ball bearings so that the door can be opened and closed conveniently and lightly. The unique and ingenious structure allows the rotating part to be hidden inside. , presents a good exterior surface, and the misaligned movable glass and fixed glass reduce the use of tape.


2. Lock the glass in the hole in the bottom basin. The bottom of the flat glass or curved glass falls into the glass slot, then slowly push it into the aluminum material attached to the wall and fix it with screws. Drill holes at the corresponding positions above the fixed glass. hole, install the straight/inclined fixing base, and connect the jacking tube. Secure it to the top of the glass with an elbow cuff.


3. Assemble all parts of the bottom basin, adjust the level of the bottom basin, and ensure that there is no water in the basin and on the bottom of the basin. The hose can expand and contract according to the distance, making the connection between the basin floor and the floor drain firm. After that, you need to test the water to ensure smooth entry into the water. Use a pencil and level to determine the drilling position of the aluminum against the wall, and use an impact drill to drill the holes.


The label