What materials need to be prepared when installing a shower room?

2022-10-18 14:57:20
a

With the improvement of people's economic level and living standards, many families now install an integrated shower room. It not only looks beautiful and elegant, but also has many functions. It is deeply loved by consumers. The comfort of using the shower room and the tight installation Therefore, shower room installation is also very particular, but how much do you know about shower room installation? Let Zhongshan shower room brand Youpu Sanitary Ware tell you.


Before installing the shower room, first check the integrity of the product accessories and prepare the required materials and tools. Materials used in shower room installation include tempered glass, frames, handles, pulleys and other accessories. Tools used for installation include tape measure, pencil, impact drill, hand hammer, electric screwdriver, glue gun, wire cutters, manual screwdriver, etc. Then make sure there is no accumulation of water, dust or debris in the installation location and the bottom basin.




1. Install the basin base

Assemble the various parts of the bottom basin, use a level to adjust the level of the bottom basin, and then ensure that there is no accumulation of water or debris in the installation position and the bottom basin. The hose can expand and contract according to the distance, firmly connecting the basin bottom and the floor drain to prevent water from leaking out. After installation, you need to test it with water to ensure that the water is flowing smoothly.


2. Install shower room frame

Before drilling, make sure the pipe drainage situation in the bathroom is clear, so as to avoid exploding hidden pipelines during drilling, which will make post-processing more troublesome. Use a pencil and level to determine the drilling position of the aluminum material against the wall, use an impact drill to drill holes in the marked holes, knock in a rubber plug at the drilled hole, and tighten the screws to the shower room frame with screws. Note that constant adjustments are required during installation to maintain the verticality of the aluminum.


3. Install glass

Clamp the glass to the drill hole in the bottom basin, drop the bottom of the flat glass or curved glass into the glass clamp groove, and slowly push the aluminum material against the wall. Secure it with screws. Find the corresponding position to drill holes above the fixed glass, install the (straight/angled) fixing seat and connect the jacking pipe. Use an elbow sleeve to secure it to the top of the glass. Install the storage rack at the correct position, tighten the shelf nuts, fix the shelf glass, and keep it vertical and horizontal. Pay attention to waterproofing under the aluminum material that fixes the glass.


Install the hardware of the movable door and install the hinges in the reserved holes of the fixed door. After installation, adjust the axis position of the lotus leaf until the door feels good when closing the door. Install suction strips or water-retaining strips on the side or bottom of the glass as required. Use silicone to seal the joints between the aluminum material and the wall, the glass and the bottom basin to prevent water leakage.


4. Testing and acceptance

At the acceptance stage, we can check whether the shower room door slides smoothly, whether there is any noise, how waterproof it is, and whether the water is unobstructed. If problems are found, make timely adjustments to make the entire shower room stronger.